2008 Greenway Construction Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option
RSS

Overview

The Annie L. Jones Greenway is comprised of three trails located within the Scottish Hills Community between SW Cary Parkway and Old Apex Road. Currently the trail surface is a combination of crushed stone and asphalt.  The combined length of the three trail segments is 1.13 miles.  These trails are over 18 years old and the Town is undertaking a renovation project to improve each of the trail segments.

Phase 1

 Gatehouse Drive Stormwater Improvements

  • This project consists of replacing old undersized culverts and realigning the trail adjacent to the culvert.

This project is complete.

Phase 2

Annie L. Jones Park

  • Removing the existing asphalt trail within Annie L. Jones park adjacent to the playground
  • New trail to be concrete (10’ width) and relocated so that it runs thru the park providing a better connection with the park
  • Construction begins July 2008 and completed by September 2008
  • Budget: $95,000

Phase 3

 Coatbridge/Tarbert/Lake Pine Segments

  • The scope of this project would analyze the remaining segments of trail for the purpose of developing a renovation plan.  The intention of the renovation plan will be to improve access, improve drainage, replace bridge and reduce impacts to the trail from the adjacent tributaries.  The Trail may be required to be realigned in some sections to minimize environmental impacts.
  • Schedule: TBD

Contact

Paul A. Kuhn, PLA, ASLA
Facilities Design & Construction Manager
Transportation & Facilities Department
Town of Cary
919-469-4360
paul.kuhn@townofcary.org

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer